Anchor Windlass Installation
Tanker Wicky Spirit
-
Anchor windlass should be replaced
-
Anchor windlass is out, preparation base for installation of the new anchor windlass
-
Operation load test completed
-
New anchor windlass in place
Collomatic Winches
Cargo Vessels
-
Winch overhauling process
-
Dowty hyd pumps-motors before O.H.
-
New Dowty hyd motor-pump
-
Continue overhauling process of Collomatic winches
-
Overhauling process of Collomatic winches
-
Automatic tension control tested, painted and ready for use
Duct Cleaning
Cargo Vessels, Tugs
-
Before cleaning air ducts
-
After cleaning air ducts
-
Air trunk in the cabins before cleaning
-
Air trunk in the cabins after cleaning
-
Air duct before cleaning
-
Air duct after cleaning
-
Negative pressure air duct cleaning
-
Brush cleaning inside trunks
Port Anchor Winch Repair
Florence Spirit
-
Failed clutch on the anchor windlass
-
Removed two drums of the main shaft
-
Replacing bronze pedestal bearing
-
Clutch teeth after repair
-
Windless test after O.H.
Yanmar M.E. Overhauling
Tanker Wicky Spirit
-
Overhauling Yanmar M.E.
-
Overhauling process of Yanmar M.E.
-
Yanmar M.E. parts for overhauling
-
Yanmar M.E. air cooler removed for cleaning
-
Replacing cylinder liners
-
Replaced cylinder heads, fuel pumps. Installed new ones after O.H.
-
Completed torque cylinder heads PME
-
-
Replacing crankpin bearings of the crankshaft
Port Turbocharger Replacement
Tanker Wicky Spirit
-
Yanmar main engine turbocharger for replacement
-
Exhaust pipes of Yanmar main engine turbocharger that will be replaced
-
Yanmar main engine turbocharger and big exhaust pipe removal
-
Installing new Yanmar main engine turbocharger, new exhaust box and new exhaust pipe
Port ZDrive Thruster Replacement
Tug Tim M
-
Spare Niigata ZDrive Unit delivered in D.D.
-
Upper G.B. dismantled from the platform
-
Niigata ZDrive Unit removed from the tug Tim M
-
Old and New Niigata ZDrive Units on the dock
-
Port Thruster shaft seal renewed
-
Niigata ZDrive Unit reinstalled on the tug after O.H.
-
Upper ZDrive G.B. reinstalled after O.H.
-
Port ZDrive Niigata Thruster in place
Replacing Detroit Engine
Tug Stormont
-
Replacing Detroit engine
-
Rigging engine in ER
-
Engine out of ER
-
Fabricating Stanchions for pontoon
-
Stanchions on Pontoon
-
Preparation of the bulhead cutout in the cargo hold
-
Bowthruster electric motor removal for bearings replacement
-
Rewelding the bulhead in the cargo hold